FORT
LOUDOUN ELECTRIC COOPERATIVE
ELECTRIC RATES
(Effective January 2007)
Residential Rates – Schedule RS
Customer Charge: $11.94 per
month
Plus
Energy Charge All Kilowatt hours - @$0.08199 per
KWH
General Power Rate – Schedule GSA
GSA-1
Demand less than 50 KW and less than 15,000 KWH
Customer Charge: $14.20 per month
Energy Charge: All Kilowatt hours
@$0.09174 per KWH
GSA-2
Demand
greater than 50 KW and less than 1,000 KW or less than 50 KW
and greater than 15,000 KWH
Customer Charge: $14.20 per month
Energy Charge: First 15,000 kilowatt
hours @$0.09174 per KWH
Additional
kilowatt hours @$0.04860 per KWH
Demand Charge: First 50 KW no charge
Over 50 KW
@$12.98 per KW
GSA-3
Demand greater than 1,000 KW or highest of 12 month billing
demand greater than 15,000 KWH
Customer Charge: $14.20 per month
Energy Charge: All Kilowatt hours
@$0.04981 per KWH
Demand Charge: First 1,000 KW @$13.06
per KW
1,001 to
5,000 KW @$14.20 per KW
LP RATE SCHEDULE – OUTDOOR LIGHTING
Energy Charge: $0.06387 per KWH PLUS Facility Charge as
listed below:
|
TYPE OF FIXTURE |
WATTS |
ENERGY KWH |
ENERGY CHARGE |
FACILITY CHARGE |
TOTAL CHARGE |
|
Mercury Vapor |
175 |
70 |
$4.26 |
$2.74 |
$7.00 |
|
|
400 |
155 |
$9.43 |
$4.11 |
$13.54 |
|
|
1000 |
378 |
$22.99 |
$7.04 |
$30.03 |
|
High Pressure Sodium |
100 |
42 |
$2.55 |
$4.18 |
$6.73 |
|
|
250 |
105 |
$6.39 |
$5.22 |
$11.61 |
|
|
400 |
165 |
$10.03 |
$7.02 |
$17.05 |
|
Metal Halide |
400 |
174 |
$10.58 |
$7.02 |
$17.60 |
Sweetwater Utilities Board
|
SWEETWATER UTILITIES RESIDENTIAL
RATES
A.
Electric
–
Effective
July
1, 2009
|
|
All Kilowatt Hours
----------------------- |
$ 0.08160 per Kilowatt hour |
|
|
Customer Charge |
$ 6.70 |
B. Water –
Effective September 1, 2009
|
|
1st 2,000
gallons------------------------- |
$10.00
(minimum) |
|
|
Next 50,000 gallons--------------------- |
$ 3.34
per 1,000 gallons |
|
|
Over 50,000 gallons--------------------- |
$ 3.16 per 1,000 gallons |
|
|
|
|
|
|
|
|
WATER SERVICE OUTSIDE CITY LIMITS 50%
ADDITIONAL |
C.
Sewer
–
Effective September 1, 2009
|
|
1st 2,000
gallons------------------------- |
$10.00
(minimum) |
|
|
Next 50,000 gallons--------------------- |
$ 3.34
per 1,000 gallons |
|
|
Over 50,000 gallons--------------------- |
$ 3.16 per 1,000 gallons |
|
|
|
|
SEWER SERVICE OUTSIDE CITY LIMITS 50%
ADDITIONAL |
D.
Gas
–
Effective July 1, 2009
|
|
General Gas Rate |
|
|
|
|
All 100 cu. ft. |
$ .88 per 100 cu. ft. |
07/18/05 |
|
|
School Rate |
|
|
|
|
All 100 cu. ft. |
$ .86 per 100 cu. ft. |
07/18/05 |
|
|
Customer Charge |
$ 4.50 |
|
|
|
|
|
2.
COMMERCIAL
PART 1
- Effective July 1, 2009
|
A.
|
All Kilowatt Hours ----------------------- |
$0.08995 per Kilowatt hour.
|
|
|
Customer Charge |
$10.70 |
A.
Outdoor
Lighting
|
|
BASE RATE |
$ 0.0742 |
|
|
|
175 watt MV |
$ 7.93 |
|
|
|
400 watt MV |
$ 14.76 |
|
|
|
1000 watt MV |
$ 33.17 |
|
|
|
100 watt HPS |
$ 7.48 |
|
|
|
250 watt HPS |
$ 12.05 |
|
|
|
400 watt HPS |
$ 17.62 |
|
|
|
1000 watt HPS |
$ 33.69 |
|
|
|
|
|
|
\

http://www.loudonutilities.org/rates.htm
Gas Rates
Effective August 1,
2005
Customer Charge -
$3.25
Therms used - 1.40
Process Load (Over
50,000 therms)
Fixed Cost - % of
customer's daily demand to LUB fixed charges (demand, take or pay
charges, SWS and FERC ordered charges).
Plus
Variable Charges - per
therm charge for gas and commodity charge Plus
Margin - Less than
200,000 therms per month.
A. Less than 200,000
therms per month
First 100,000 therms -
$.044 per therm
Over 100,000 therms -
$.037 per therm
B. Over 200,000
therms per month
First 750,000 therms -
$.024 per therm
Next 750,000 therms -
$.022 per therm
Over 1,500,000 therms
- $.020 per therm
CITY OF
MADISONVILLE UTILITIES
http://www.cityofmadisonville.org/city_services.htm
WATER & SEWER RATES
EFFECTIVE JULY 1, 2008
|
Gallons Per Month |
Per 1,000Gallons |
|
|
Inside |
Outside |
|
FIRST 2,000 (Minimum) |
$11.82 |
$22.00 |
|
NEXT 13,000 |
$4.04 |
$5.90 |
|
OVER 15,000 |
$4.04 |
$5.90 |
|
|
|
|
|
Tap Fees |
|
|
|
WATER TAP |
$300.00 |
$700.00 |
|
SEWER
TAP |
$300.00 |
$300.00 |
The Sewer Rates are the same as the Water Rates except that tax is
added to water and not to sewer
TELLICO AREA SERVICES SYSTEM
Effective date July 1, 2009 |
|
|
|
|
|
|
|
|
|
|
First |
2,000 gallons |
minimum bill $13.92 |
|
All over |
2,000 gallons |
$3.39/thousand gallons |
|
|
|
|
|
Minimum bill on 1 inch and larger meters
will stay at the minimum until water
consumption reaches a dollar value larger
than the minimum bill. |
|
|
|
|
|
METER SIZE |
MINIMUM BILLUSAGE UP TO MINMUM |
|
¾ inch |
$13.92 |
2,000 gallons |
|
1 inch |
$22.40 |
4,500 gallons |
|
1 ½ inch |
$105.45 |
29,000 gallons |
|
2 inch |
$180.00 |
51,000 gallons |
|
3 inch |
$261.40 |
75,000 gallons |
|
4 inch |
$515.65 |
150,000 gallons |
|
6 inch |
$980.00 |
287,000 gallons |
|
8 inch |
$1444.50 |
424,000 gallons |
|
|
|
|
REGULAR ¾ INCH WATER SERVICE FEE
$900.00
1 INCH WATER SERVICE FEE $1530.00
2 INCH WATER SERVICE FEE $4530.00
PLUS BORE COST IF APPLICABLE ON ALL METER
SETS |
|
|
|
|
|
APPROVED REDUCED PRESSURE ZONE BACK FLOW
PREVENTERS REQUIRED ON ALL INDUSTRIAL TYPE
SERVICES. |
|
|
|
|
|
Fire Protection |
|
|
|
Sprinkler Size |
Monthly Charge |
|
|
6 inch |
$81.05 |
|
|
8 inch |
$121.57 |
|
|
10 inch |
$162.08 |
|
|
12 inch |
$202.61 |
|
|
|
|
|
|
FIRE LINE SERVICE
To be determined by Tellico Area Services
System on an individual basis. |
|
|
|
DETECTOR CHECK WITH LEAK INDICATOR METER
REQUIRED ON ALL FIRE LINE SERVICES
|
|
|
|
|
TASS 2009 WASTEWATER RATE SCHEDULE |
Effective date July 1, 2009 |
|
|
|
|
|
|
First |
2,000 gallons |
minimum bill $17.00 |
|
All Over |
2,000 gallons |
$5.05/thousand gallons |
|
|
|
|
|
METER SIZE |
MINIMUM BILL |
USAGE UP TO MINMUM |
|
¾ inch |
$17.00 |
2,000 gallons |
|
1 inch |
$30.00 |
4,500 gallons |
|
1 ½ inch |
$138.20 |
26,000 gallons |
|
2 inch |
$226.00 |
44,000 gallons |
|
3 inch |
$352.30 |
69,000 gallons |
|
4 inch |
$594.75 |
117,000 gallons |
|
6 inch |
$1104.75 |
218,000 gallons |
|
8 inch |
$1614.80 |
319,000 gallons |
|
|
|
|
REGULAR SEWER SERVICE FEE $900.00
PLUS BORE COST IF APPLICABLE ON ALL SEWER
SERVICES
SEWER SERVICES WILL BE AT SAME COST OF WATER
METER |
|
|
|
|
|
TRDA Fee- $1500.00 if applicable in addition
to sewer service fee.
Construction cost of Pump Systems
- All construction cost of grinder pumps,
step system or other types of on-site system
is to be paid by individuals or POA. TASS
will furnish standard specifications and
will inspect construction prior to making
sewer service. |
|
|
|
|
|
|
|
|
|
|
|
Monroe County Office of
Economic Development
103 College St., Suite.
6 - Madisonville, TN 37354
Office: (423)
442-3652 Fax: (423) 442-7933 |